Site development for new pre-fabricated lab building. Site work included clearing of site, development of new access roads, site fencing with access gates, extending electrical, water and sanitary to the site and installation of building lab foundations. Bi-Con received the pre-fab lab, installed rigging, lifted, set and leveled the lab on the newly installed foundations and made final connections for utilities to the lab.
Client: EPCO | |
Location: Steubenville, OH | |
Project Type: Site Development / Building Foundations / Pre-Fab Building | |
Services: Design Build / General Construction | |
Market: Industrial |