Divisions About Bi-Con Associations Safety Contact Us Home

 

PROJECT GALLERY
(click on any image for larger view)

 
 

42 inch Launcher

This Customer Designed Launcher was fabricated at the Bi-Con facility using API-1104 weld procedures for MIG and Submerged arc welding. All X-rays and hydrostatic testing were completed at the Bi-Con facility as well. This launcher is used on natural gas systems and pipeline integrity upgrades.

42 inch Receiver

API-1104 weld procedures for MIG and Submerged arc welding were utilized in fabricating this Receiver. QC, X-ray and Hydrostatic Testing were also performed at the Bi-Con facility for this fabrication project. This Receiver was a customer design and is used on Natural Gas Systems and Pipeline Integrity Upgrades.

Lube Oil Skids

These Lube Oil Skids were fabricated in house using ASME weld procedures for stainless steel MIG and TIG welding. Fabrication was completed with QC, X-ray and Hydrostatic Testing. These Skids are used on a turbine engine lubrication system.

Stripper Tower

This Stripper Tower was fabricated for a Refinery Vesse!. ASME weld procedures were used for MIG welding. QC, X-ray and Hydrostatic testing were also performed at Bi-Con.

Amine Stripper

Tower Bi-Con fabricated this Tower utilizing ASME weld procedures for MIG welding. QC, X-ray and Hydrostatic Testing completed this Tower that is used in the crude oil distillation process.

Tower Vessel Extension

This tower was needed for an extension on a Refinery Vesse!. ASME weld procedures for MIG welding were utilized. Bi-Con performed all QC, X-rays and Hydrostatic Testing.

 

Stainless Steel Pipe

Bi-Con installed stainless steel piping on the Lube Oil Tank while in the Bi-Con Manufacturing Shop. ASME welding procedures were used for MIG stainless welding. QC, X-ray and Hydrostatic testing were also completed before being shipped to the Customer. The Customer later installed this tank for their lubrication system in their plant.

 

 

<MAIN PAGE>
<PREV PAGE>  <NEXT PAGE>